The proposed work is generally described as follows:
Project consist of removal and replacing approximately 50 LF of existing 8"
VCP gravity sewer pipe with 8" PVC gravity sewer pipe, installation of
approximately 9 LF of 8" PVC gravity sewer pipe and grouting and
abandonment of approximately 25LF of existing 8" gravity sewer, removal of
approximately 51 LF of existing 10" VCP gravity sewer, removal and
replacement of approximately 51 LF of existing 12" PVC gravity sewer,
installation of 24 LF of 6" PVC service line, 4 core borings to existing
manholes and removal and replacement of 1 new sanitary manhole. This will
include but is not limited to temporary bypass pumping, construction
temporary site access, MOT, utility replacement/ relocation, erosion control,
dewatering and restoration